DON27BZ02-NV023 TITLE: Attritable Turbine for Low-Cost Attack Systems (ATLAS)
OUSW (R&E) CRITICAL TECHNOLOGY AREA(S): Contested Logistics Technologies (LOG)
COMPONENT TECHNOLOGY PRIORITY AREA(S): Advanced Materials;Sustainment
PROJECTED CMMC LEVEL REQUIREMENT: Level 2 (Self)
The technology within this topic is restricted under the International Traffic in Arms Regulation (ITAR), 22 CFR Parts 120-130, which controls the export and import of defense-related material and services, including export of sensitive technical data, or the Export Administration Regulation (EAR), 15 CFR Parts 730-774, which controls dual use items. Offerors must disclose any proposed use of foreign nationals (FNs), their country(ies) of origin, the type of visa or work permit possessed, and the statement of work (SOW) tasks intended for accomplishment by the FN(s) in accordance with the Announcement. Offerors are advised foreign nationals proposed to perform on this topic may be restricted due to the technical data under US Export Control Laws.
OBJECTIVE: Design, develop, and prototype a low-cost, limited-life gas turbine engine producing 150-300 lbf of SLS thrust with an estimated engine life expectancy of 10-15 hours, leveraging advanced design and manufacturing techniques to significantly reduce part count, production lead time and scaling, and overall unit cost compared to traditionally manufactured engines in the same class.
DESCRIPTION: The Department of War has an increasing need for affordable, reliable, and rapidly producible propulsion systems to support the proliferation of attritable Unmanned Aerial Systems (UAS), loitering munitions, and stand-off strike weapons. Current small turbofan and turbojet engines in the 150-300 pounds of thrust (lbf) class often rely on traditional aerospace material and manufacturing processes, resulting in high unit costs and long supply chain lead times. These factors are prohibitive for systems intended to be employed in mass or as expendable assets.
This SBIR topic seeks innovative engineering and manufacturing approaches to design a turbofan engine that meets the thrust requirements while dramatically lowering cost per unit. Proposers should consider advanced design and manufacturing techniques to produce a low-cost engine that can leverage existing industrial base capacity to reduce risk to procurement supply chains.
Key technologies and design features to consider are:
Performance metrics of interest include specific fuel consumption (SFC), thrust-to-weight ratio, and operational reliability for mission durations typical of attritable UAS or cruise munitions.
The engine will be fully operational utilizing Navy relevant fuels and demonstrate resilience to harsh maritime storage and launch conditions without significant performance degradation. The engine is expected to demonstrate functionality when subject to storage life of 6-12 months in Maritime environments and meet minimum required performance after exposure to shore-based and shipborne launch environments.
Notional performance objectives for this SBIR topic are provided in the Tables below:
Table 1: ATLAS engine notional operational envelop and performance objectives.
Parameter Specification
Electrical Power Generation [W] 500-1500
Thrust, SLS [lbf] 150-300
SFC [lbm/lbf/hr] < 1.5
Cruise Altitude [ft] 20k
Table 2: ATLAS engine notional mass and dimensional properties objectives.
Parameter Specification
Approximate OML Diameter [in] < =10
Weight, Dry [lbm] 25-35
Length [in.] 14-24
Table 3: ATLAS engine notional storage & launch conditions.
Parameter Specification
Start Altitude Sea Level
Start Method Air Impingement
Storage Duration (Wooden Round) 6-12 months, Maritime Environment
Launch & Assist Method Rail, Catapult, or Rocket Assist
PHASE I: Conduct a feasibility study and develop a conceptual design for a 150-300 lbf. turbofan engine.
PHASE II: Refine the conceptual design based on Government feedback and develop a detailed design for a fully functional prototype engine. Transition the Phase I conceptual design into fully functioning, physical hardware and demonstrate engine operation.
PHASE III DUAL USE APPLICATIONS:
REFERENCES:
KEYWORDS: Small Gas Turbine Engine, Advanced Manufacturing, Additive Manufacturing, Attritable, Disposable, Expendable Unmanned Arial Systems Propulsion, Low-Cost, 150-300 pounds of thrust, lbf, Limited Life Propulsion
TPOC 1: David Gonzalez
david.r.gonzalez32.civ@us.navy.milTPOC 2: Craig Collins
craig.a.collins36.civ@us.navy.milTPOC3: Christine Myers
christine.m.myers21.civ@us.navy.mil
| 11/6/26 | Q. | 1. Unit cost target. What price per engine, at production quantity, would the Navy treat as a success for this topic? We're weighing new material processes, and the budget per unit decides whether they're worth building.
2. Priority and path forward. How firmly does the Navy plan to move a successful Phase I into Phase II and production? Is there a named program or quantity behind the topic? We're ready to build fabrication equipment, and want to commit only if there's a real path past Phase I. 3. Demand once it works. If a Phase I proves a cheaper engine or component, what quantities does the Navy expect to buy, and over what timeline? We're a small business planning to grow around this. Before we invest in production capacity, we need to know a proven result would have a real buyer. 4. Test support. Can Phase I performers use government spin-test or engine-test facilities, or should the proposal budget for commercial testing? |
| A. | 1. Offerors should target a substantial cost reduction compared to conventional products in a similar size class. Your proposal must outline a realistic pathway to this target by specifying assumed production quantities, cost model, learning-curve basis, production-time, and the baseline engine used for comparison. Unsupported unit-cost assertions will not be persuasive.
2. Proposing a Phase II plan is required to demonstrate your path to technology maturation. However, Phase I funding does not guarantee Phase II selection, follow-on contracts, or transition. These subsequent steps are subject to technical success, funding availability, and Navy mission priorities. 3. Offerors should target a substantial cost reduction compared to conventional products in a similar size class. Your proposal must outline a realistic pathway to this target by specifying assumed production quantities, cost model, learning-curve basis, production-time and the baseline engine used for comparison. Unsupported unit-cost assertions will not be persuasive. 4. The topic does not guarantee access to Government spin-test, component-test, or engine-test facilities. Proposals should include a credible, funded test approach using commercial, university, company, or other available facilities. Proposed Government-facility use may be identified as an option but could present significant challenges due to competing priorities and should be treated as subject to separate approval, availability, scheduling, and applicable agreements. |
|
| 11/4/26 | Q. | 1. The title says “turbine” and the Phase I text says “turbofan,” but the keywords include turbojet. At this diameter, would a turbojet or very-low-bypass architecture be acceptable? The SFC target (<1.5) looks reachable without a high-bypass fan, so the answer could change your whole concept.
2. Which Navy fuels are required (JP-5 only, or others)? 3. Does the 500-1500 W requirement need to be met at start or only in cruise, and is a starter-generator on the main shaft preferred? 4. What cost target does the Navy have in mind? The topic gives none, and it will shape every trade. |
| A. | 1. The stated intent for this topic is a turbofan. Offerors proposing a turbojet must explicitly demonstrate (rigorous system level analysis) how their design meets or exceeds all performance, cost, and operational objectives. Alternative architectures will not be treated as default equivalents without a compelling argument.
2. Heavy fuels should be considered, such as JP-5, JP-10, JP-8, diesel. 3. An electric starter-generator integrated/fitted to the main engine shaft is acceptable. The starter-generator should be capable of satisfying at least the power generation objective at a cruise power setting. 4. Offerors should target a substantial cost reduction compared to conventional products in a similar size class. Your proposal must outline a realistic pathway to this target by specifying assumed production quantities, cost model, learning-curve basis, production-time and the baseline engine used for comparison. Unsupported unit-cost assertions will not be persuasive. |
** TOPIC NOTICE ** |
The Navy Topic above is an "unofficial" copy from the Navy Topics in the DoW FY-27 Release 2 SBIR BAA. Please see the official DoW Topic website at www.dodsbirsttr.mil/submissions/solicitation-documents/active-solicitations for any updates. The DoW issued its Navy FY-27 Release 2 SBIR Topics pre-release on November 4, 2026 which opens to receive proposals on December 2, 2026, and closes January 6, 2027 (12:00pm ET). Direct Contact with Topic Authors: During the pre-release period (November 4, through December 1 , 2026) proposing firms have an opportunity to directly contact the Technical Point of Contact (TPOC) to ask technical questions about the specific BAA topic. The TPOC contact information is listed in each topic description. Once DoW begins accepting proposals on December 2, 2026 no further direct contact between proposers and topic authors is allowed unless the Topic Author is responding to a question submitted during the Pre-release period. DoD On-line Q&A System: After the pre-release period, until December 16, 2026, at 12:00 PM ET, proposers may submit written questions through the DoW On-line Topic Q&A at https://www.dodsbirsttr.mil/submissions/login/ by logging in and following instructions. In the Topic Q&A system, the questioner and respondent remain anonymous but all questions and answers are posted for general viewing.